MiningMath

MiningMath

Loading...

All parameters simultaneously handled,delivering multiple scenarios

MiningMath’s single-step methodology generates a diverse range of schedules straight from the block model, in a single-step! And your short-term requirements can also be accounted for within the same long-term run.

Our software allows mining engineers to improve their strategic analysis through risk assessments that are unconstrained by a stepwise approach to optimization. 

The real global mining optimization methodology helps to integrate multiple areas of the business. It handles all parameters simultaneously, delivering multiple scenarios and accounting for both strategic and tactical aspects.

Thousands of potential schedules can be generated with a multitude of different methods. However, they all follow the same stepwise rationale, with one step guiding the next ones. Commonly, schedules follow from a set of nested pits and other fixed input parameters such as geotechnics and metallurgical performance. Therefore, the results frequently present similar behaviors, restricting the full exploration of the solution space. 😵‍💫

Do not over constrain. Instead…:

✅ Identify your bottlenecks before going into detailed planning

✅ Check how each constraint interacts with each other

✅ Test how each assumption impacts the economics

✅ Search for realistic lower risk and higher potential scenarios

✅ Reveal hundreds of unseen distinctive solutions

Start testing today!

Share This Article

Leave a Comment

Chat Icon

Hi, it's Mima here 😇 Ask me any questions!